Fredericksburg District: Weekly Travel Alert, Aug. 9-15, 2026

I-95 Northbound and Southbound

Exit 126 (Spotsylvania)

Monday - Friday, 9 p.m.-5 a.m. Scheduled bridge inspection of I-95 bridges over Route 1/17 with alternating single and double lane closures.

I-95 Northbound

Exit 143 (Aquia/Garrisonville)

Sunday – Monday, 10 p.m.-4:30 a.m. and Monday – Thursday, 9 p.m.-4:30 a.m. Pavement markings near exit 143 (Aquia/Garrisonville) between mile markers 142-145 in Stafford County. Single lane closures begin at 10 p.m. Sunday night and 9 p.m. Monday-Thursday nights, and double lane closures begin at 11 p.m. Sunday and at 10 p.m. all other nights. All northbound lanes reopen by 4:30 a.m.

Exit 126 (Spotsylvania)

Monday, 9 p.m.-5 a.m. Single lane closure at exit 126 for pavement marking work for construction of I-95 exit 126 area improvements

I-95 Southbound

Exit 143 (Aquia/Garrisonville)

Sunday – Monday, 10 p.m.-4:30 a.m. and Monday – Thursday, 9 p.m.-4:30 a.m. Pavement markings near exit 143 (Aquia/Garrisonville) between mile markers 142-145 in Stafford County. Single lane closures begin at 10 p.m. Sunday night and 9 p.m. Monday-Thursday nights, and double lane closures begin at 11 p.m. Sunday and at 10 p.m. all other nights. All southbound lanes reopen by 4:30 a.m.

Exit 110 (Ladysmith)

Monday – Thursday, 7 a.m.-4 p.m. Shoulder closures near the exit 110 (Ladysmith) interchange and off-ramp. All travel lanes and ramp lanes remain open with the ramp being narrowed. Crews will be performing drainage pipe and roadside maintenance along the shoulders of the interstate travel lanes and off-ramp. Shoulder closures will be removed by 3 p.m. Thursday. Travelers should use caution and stay alert for equipment along the shoulders.

Caroline County

Route 1

Monday - Friday, 9 a.m.-3 p.m. Single lane closure between Route 639 (Ladysmith Road) and Route 207 (Rogers Clark Boulevard) for utility work under permit.

Route 1 over Motto River

Sunday – Thursday, 7 p.m.-5 a.m. Alternating lane closures. Bridge maintenance.

Route 17 (Tidewater Trail)

Sunday – Thursday, 9 p.m.-5 a.m. Pavement marking. Alternating lane closures between Hazelwood Lane and Mount Creek Bridge.

Route 207 (Rogers Clark Boulevard)

Sunday – Thursday, 7 p.m.-6 a.m. Pavement marking and installation of rumble strips. Alternating lane closures on northbound Route 207 between Polecat Creek bridge and Devils Three Jump Road, and on Route 207 southbound between the Mattaponi River bridge and the railroad bridge.

Route 629 (Ladysmith Road)

Monday - Friday, 9 a.m.-3 p.m. Lane closure between Route 1 and Partlow Road for fiber install work under permit.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 1 over Long Creek

Route 1 over Polecat Creek

Route 1 over Baker Creek

Route 1 over Stevens Mill Run

Route 1 over South River

Route 1 over Motto River

Route 17 over Goldenvale Creek

Route 301 over Campbell Road

Route 301 over Wilcox Drive

Route 301 over N. Fork Peumonsend Creek

Route 301 over Reedy Creek

Route 301 over Polecat Creek

Route 601 over Polecat Creek

Route 603 over Motto River

Route 646 over Maracossic Creek

Route 648 over Reedy Creek

Route 662 over Reedy Creek

Route 665 over Beverly Run

Essex County

Route 17 Northbound

Sunday – Thursday, 7 p.m.-5 a.m. Bridge repairs on Route 17 northbound between Tappahannock and the Caroline County line. Alternating lane closures.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 609 over Mill Race

Route 612 over Dragon Run

Route 635 over Occupacia Creek

Route 659 over Hoskins Creek

Route 691 over Piscataway Creek

Secondary Road Resurfacing

Monday – Friday, 7 a.m.-7 p.m. Alternating lane closures on various secondary routes for road resurfacing. Flagging crew will direct traffic on the following routes:

Route 610

Route 611

Route 613

Route 615

Route 616

Gloucester County

Route 17 Northbound

Sunday - Friday, 9 p.m.-8 a.m. Single lane closure for intersection improvement project between Route 17 (W. Main Street) and Route 1024 (Beehive Drive).

Route 17 Southbound

Sunday - Friday, 6 p.m.-5 a.m. Single lane closure for intersection improvement project between Route 17 (W. Main Street) and Route 1024 (Beehive Drive).

Route 17 Northbound and Southbound

Monday - Friday, 7 a.m.-8 p.m. Alternating lane closures for bridge maintenance between Route 17 Business intersection and Route 198/33 intersection.

Route 33 (General Puller Highway)

Sunday – Thursday, 7 p.m.-5 a.m. Milling and paving. Alternating lane closures between the King and Queen County line and Route 17.

Monday – Thursday, 7 p.m.-5 a.m. Pavement marking. Alternating lane closures between the King and Queen County line and Route 17.

Route 606 (Ark Road)

Monday – Thursday, 9 a.m.-2 p.m. Paving between Route 17 and the end of state maintenance. Flagging crew will direct one-way, alternating traffic.

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Single lane closure near Beaverdam Park.

Route 635 (Piney Swamp Road)

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Single lane closure. Flagging crew will direct one-way, alternating traffic.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 3 over Cow Creek

Route 17 over Fox Mill Run

Route 198 over Ferry Creek

Route 198 over Harpers Creek

Route 602 over Burkes Pond

Route 614 over Carters Creek

Route 616 over Beaverdam Swamp

Route 627 over Wilson Creek

Route 641 over a branch of Sarah Creek

Route 662 over Fox Creek

King George County

Route 3

Sunday - Friday, 7 p.m.-7 a.m. Mobile alternating lane closures for pavement marking work between Stafford County line and Westmoreland County line.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 3 over Muddy Creek

Route 3 over Birchwood Creek

Route 206 over Williams Creek

Route 301 over Machodoc Creek

Route 301 over Williams Creek

Route 622 over Pine Hill Creek

Route 625 over Guicatic Creek

Route 625 over Mattox Creek

King and Queen County

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 14 over Poropotank Creek

Route 14 over Heartquake Creek

Route 360 over Mattaponi River

Route 360 over Mattaponi River at Aylett

Route 602 over Dragon Run

Route 614 over Exol Swamp

Route 617 over Exol Swamp

Route 619 over Rickenaw Creek

Route 627 over Maracossic Creek

Route 631 over Market Swamp

Route 633 over Garnetts Creek

Route 685 over Market Swamp

Route 721 over Chapel Hill Swamp

Route 721 over Beverly Creek

King William County

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 360 over Pamunkey River

Route 360 over Moncuin Creek

Route 360 over Aylett Creek

Route 600 over Aylett Creek

Route 600 over Herring Creek

Route 604 over Herring Creek

Route 609 over Herring Creek

Route 614 over Pamunkey River

Route 615 over Pamunkey River

Route 618 over Moncuin Creek

Route 625 over Custis Pond

Route 629 over Acquinton Creek

Route 629 over Mattaponi River

Route 632 over Cohoke Mill Pond spillway

Route 632 over Harrisons Creek

Route 634 over Sandy Creek

Route 701 over pond

Lancaster County

Route 3

Sunday - Friday, 7 p.m.-7 a.m. Mobile alternating lane closures for pavement marking work between Richmond County line and Middlesex County line.

Route 3

Wednesday - Friday, 9 a.m.-3:30 p.m. Paving. Alternating lane closures between Clark Road and Courthouse Road

Route 695 (Windmill Point Road)

Wednesday-Friday, 9 a.m.-7 p.m. Alternating lane closures with flaggers directing traffic between Route 3 and end of state maintenance for sign installation ahead of bridge replacement project.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 3 over branch of Corrotoman River

Route 3 over Bellwood Run

Route 200 over Carters Creek

Route 600 over McMahons Swamp

Route 354 over Ball Mill Pond

Route 614 over Browns Creek

Middlesex County

Route 17 (Tidewater Trail) Southbound

Tuesday, 7 a.m.-5 p.m. Single lane closure for bridge maintenance over Towne Bridge Swamp between Route 603 (Warner Road) and Forest Chapel Road.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 17 over Dragon Run

Route 227 over Urbanna Creek

Route 603 over Dragon Run

Route 604 over Mason's Mill Stream

Route 629 over My Lady's Swamp

Route 625 over Barrick's Pond

Northumberland County

Route 360 (Northumberland Highway)

Monday - Tuesday, 9 a.m.-3:30 p.m. Alternating lane closures for paving between Route 604 (Avalon Lane) and Route 639 (Cedar Point Road).

Route 360

Sunday - Friday, 7 p.m.-7 a.m. Mobile alternating lane closures for pavement marking work between Richmond County line and Route 664.

Route 634 (Spring Road)

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work near Route 360 intersection. Flagging crew will direct one-way, alternating traffic.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 202 over Hampton Hall Creek

Route 360 over Coan River

Route 634 over Clark's Mill Pond

Route 679 over Mill Creek

Richmond County

Route 360

Sunday - Friday, 7 p.m.-7 a.m. Mobile alternating lane closures for pavement marking work between Essex County line and Northumberland County line.

Bridge Cleaning

Monday – Saturday, 7 p.m.-7 a.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 3 over Chinn's Mill Pond

Route 3 over Totuskey Creek

Route 608 over Farnham Creek

Route 614 over Richardsons Creek

Route 619 over Totuskey Creek

Route 620 over Little Totuskey Creek

Route 623 over The Big Swamp

Route 624 over Cat Point Creek

Route 634 over Cat Point Creek

Route 637 over Cat Point Creek

Route 697 over Little Totuskey Creek

Secondary Road Resurfacing

Monday – Friday, 7 a.m.-7 p.m. Road resurfacing, applying surface treatment. Flagging crew will direct one-way, alternating traffic on the following routes:

Route 623

Route 633

Route 645

Spotsylvania County

Route 1 Northbound and Southbound

Sunday - Thursday, 7 p.m.-6 a.m. Mobile lane closures for pavement markings between the Veterans Administration Healthcare Center and Spotsylvania County line.

Route 1 Northbound

Monday – Friday, 9 a.m.-3 p.m. Single lane closure on northbound Route 1 between Ondura Drive and Guinea Station Road for waterline work under permit.

Route 1 Northbound

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between Crossing Court and Market Street for construction of I-95 exit 126 area improvements.

Route 1 Southbound

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between Market Street and the I-95 southbound off-ramp at exit 126 (Spotsylvania) for construction of I-95 exit 126 area improvements.

Route 1 Southbound

Monday – Friday, 9 a.m.-3 p.m. Single lane closure on Route 1 southbound between Massaponax Church Road and Ladysmith Road in Caroline County for fiber installation under permit.

Route 1 at Route 606 (Mudd Tavern Road)

Wednesday – Thursday, 8 p.m.-5 a.m. Utility work at intersection. Flaggers will direct drivers through the work zone.

Route 1 and Route 17

Monday - Friday, 9 p.m.-5 a.m. Scheduled bridge inspection of I-95 bridges over Route 1/17 with alternating lane closures.

Route 3

Sunday – Thursday, 7 p.m.-6 a.m. Mobile lane closures for pavement marking work between Gateway Boulevard in the City of Fredericksburg and Bragg Road in Spotsylvania County.

Route 3

Sunday - Friday, 7 p.m.-7 a.m. Mobile alternating lane closures for pavement markings between Orange County line and the western city line of Fredericksburg.

Route 17 (Mills Drive)

Monday – Friday, 9 a.m.-3 p.m. Shoulder closures and traffic weave between Hospital Boulevard and Massaponax Church Road. Road construction under permit.

Route 17 (Mills Drive)

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Alternating lane closures on Route 17 near Route 2 and at the intersection of Route 608 (Massaponax Church Road).

Route 208 (Courthouse Road/Lake Anna Parkway)

Sunday – Thursday, 8 p.m.-6 a.m. Milling and paving at multiple locations with alternating lane closures for mobile operation.

Route 606 (Post Oak Road)

Thursday - Friday, 8:30 a.m.-7 p.m. Alternating lane closures for pavement patching ahead of overlay between Route 659 (Lanes Corner Road) and Route 793 (Old Courthouse Road).

Route 608 (Massaponax Church Road)

Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic directed by a flagging crew between Flippo Drive and Summit Crossing Road. Road construction under permit.

Route 608 (Robert E. Lee Drive)

Monday – Friday, 9 a.m.-7 p.m. Pavement markings. Flagging crew will alternate one-way traffic between Route 208 and Catharpin Road.

Farmstead Lane

Farmstead Lane, between Gordon Road and Lottie Court, along with the turning lane on Gordon Road onto Farmstead Lane, will be closed daily starting Monday, August 10, through Thursday, August 13. The closure will take place from 7 a.m. to 4:30 p.m. for a pipe replacement project. The road will reopen to traffic nightly. During the daily closure, traffic will be detoured to Green Arbor Drive, then to Elsie Lane, and back to Farmstead Lane. Access to driveways within the closure area will be maintained for residents. All work is scheduled weather permitting.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 1 over Po River

Route 1 over Ni River

Route 2 over Deep Run Creek

Route 3 over Nine Mile Branch

Route 208 over Massaponaz Creek

Route 618 over Golin Run

Route 620 over I-95

Route 627 over Ni River

Route 649 over Glady Run

Route 738 over Matt River

Route 738 over Arnold's Creek

Stafford County

Route 1

Monday – Thursday, 9 a.m.-3 p.m. Alternating single lane closures at Route 1 over Chopawamsic Creek, between Russell Road and Corporate Drive. Bridge replacement project.

Tuesday, 9 a.m.-3 p.m. Mobile lane closure for signal work at the intersection of Route 17 Business (Warrenton Road) and Route 218 (Butler Road)

Sunday - Friday, 7 p.m.-7 a.m. Alternating lane closures for pavement markings between north of the City of Fredericksburg line and Prince William County line.

Route 1 Northbound

Sunday – Thursday, 9 p.m.-5 a.m. Guardrail work. Single lane closure near Bells Hill Road/Coal Landing Road.

Sunday - Thursday, 9 p.m.-5 a.m. Single lane closure at the intersection of Route 1 (Cambridge Street) southbound and Route 17 for guardrail installation.

Route 3, Route 3 Business (Kings Highway), and Blue and Gray Parkway

Sunday – Thursday, 8 p.m.-6 a.m. Alternating lane closures for milling and paving at various locations on Route 3, Blue and Gray Parkway, and Route 3 Business (Kings Highway) in the Ferry Farm area.

Route 3 Business (Kings Highway)

Sunday – Thursday, 9 p.m.-5 a.m. Single lane closure for guardrail installation near Naomi Road.

Route 3

Sunday - Friday, 7 p.m.-7 a.m. Alternating lane closures for pavement markings between east of the City of Fredericksburg line and Route 3 and between east of the City of Fredericksburg line and King George County line.

Route 17

Monday – Friday, 9 a.m.-3 p.m. Median improvements under permit. Expect alternating northbound and southbound lane closures on Route 17 between Poplar Road and the entrance to the Cardinal Forest subdivision.

Route 17

Sunday - Friday, 7 p.m.-7 a.m. Alternating lane closure for pavement markings between Route 1/Route 212 and Fauquier County line.

Route 17 Southbound

Monday – Friday, 9 a.m.-3 p.m. Guardrail work. Single lane closure near Tensley Lane.

Route 218

Sunday - Friday, 7 p.m.-7 a.m. Alternating lane closures for pavement markings between Route 212/218 and Baron Park Road and between Route 1 and King George County line.

Route 606 (Ferry Road)

Monday - Tuesday, 9 a.m.-7 p.m. One-way alternating lane closures for pavement marking between Route 3 and White Oak Road.

Route 607 (Deacon Road)

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation at the intersection of Route 218.

Route 610 at Aquia Creek Bridge

Monday – Friday, 9 a.m.-3 p.m. Guardrail work. Flagging crew will alternate one-way traffic at the Aquia Creek bridge.

Route 630 (Courthouse Road)

Monday - Thursday, 7 p.m.- 6 a.m. Mobile operation for milling and paving between Shelton Shop Road and Winding Creek Road.

Route 652 (Truslow Road)

Monday - Friday, 9 a.m.-3 p.m. One-way alternating lane closures for pavement marking between Poplar Road and Berrea Church Road.

Route 684 (Staffordboro Boulevard)

Wednesday – Thursday, 8 p.m.-6 a.m. Milling and paving between Route 610 and Pike Place. Alternating single lane closures.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 615 over Deep Run Creek

Route 626 over Potomac Creek

Route 3 over stream

Bridge Cleaning

Monday – Saturday, 7 p.m.-5 a.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 1 over Claiborne Run

Route 1 over Accakeek Creek

Route 1 over Austin Run

Route 1 over Tank Creek

Westmoreland County

Route 205

Sunday - Friday, 7 p.m.-7 a.m. Mobile alternating lane closures for pavement marking work between the Northumberland and Westmoreland County line and Creek Valley Lane and between King George County line and Route 3.

Bridge Cleaning

Monday – Saturday, 9 a.m.-3:30 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 3 over Chandlers Mill Pond

Route 3 over Popes Creek

Route 3 over Mattox Creek

Route 202 over Nomini Creek

Route 205 over Mattox Creek

Route 205 over Tide Mill Stream

Route 205 over Rosier Creek

Route 205 over branch of Rosier Creek

Route 608 over Kinsale Creek

Route 621 over Nomini Creek

Route 621 over Tidewell's Marsh

Route 625 over Horner's Mill Stream

Route 639 over Popes Creek

Route 642 over Big Swamp

Secondary Road Resurfacing

Monday – Friday, 7 a.m.-7 p.m. Road resurfacing, applying surface treatment. Flagging crew will direct one-way, alternating traffic on the following routes:

Route 347

Route 615

Route 621

Route 626

Route 632

Route 639

Additional Projects in Fredericksburg District 

Gloucester County and Middlesex County

Route 17 Northbound Bridge Replacement at Dragon Run

Bridge replacement is underway at the Route 17 northbound bridge over Dragon Run at the Gloucester County and Middlesex County line. The new bridge will be wider, taller, and longer than the existing bridge, which was built in 1931. Route 17 northbound will remain reduced to a single lane at the bridge while crews construct crossovers for a traffic diversion to the Route 17 southbound bridge planned for summer 2026. Work zone barriers will continue to separate the left and right lanes of Route 17 northbound. The right lane closed in Dec. 2025 after a vehicle crash damaged the bridge rail and guardrail. Project completion expected in Dec. 2027.

Lancaster County

Route 790 (Kamps Mill Road)

Route 790 (Kamps Mill Road) over Camps Millpond in Lancaster County has closed for motorist safety after a routine inspection of a culvert found deterioration. Motorists should use Route 3 as the recommended detour. VDOT will announce an estimated timeline to reopen the road to traffic once the emergency repair project schedule is finalized.

Northumberland County and Westmoreland County

Route 617 (Gardy's Mill Road)

Gardy's Mill Road is closed at Gardy's Millpond at the Northumberland and Westmoreland line with no reopening date. Gardy's Mill Road closed to through traffic for public safety in May 2025 due to a dam breach at the millpond. Water also damaged the road's travel surface. The Virginia Department of Transportation (VDOT) maintains the road, which runs on top of the dam maintained by the Virginia Department of Wildlife Resources (DWR). Travelers should use Route 202 (Hampton Hall Road) as a detour.

Richmond County

Route 360 at Route 624 (Newland Road) intersection improvements

Construction began in April 2026 on a $2.8 million project at the Route 360 and Newland Road intersection. The project is making several improvements to reduce the risk that vehicle paths will overlap at the intersection, resulting in a crash. The project is scheduled to be finished in Sept. 2026.

Spotsylvania County

I-95 Exit 126 Area Improvements

Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in Sept. 2027.

Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion expected in Sept. 2026.

Stafford County

Route 1 Bridge Replacement at Chopawamsic Creek

Construction is underway on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Construction is expected to be complete in June 2028. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases.

Route 1 at Telegraph Road and Woodstock Lane 

Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page

Route 1 and Courthouse Road Intersection Improvement Project

Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion expected in summer 2027. Visit the county project page

Route 644 (Rock Hill Church Road) Bridge Replacement

Route 644 (Rock Hill Church Road) is closed to replace the temporary single-lane structure over Aquia Creek with a two-lane bridge. Rock Hill Church Road will remain closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.

Commuting and Ridesharing Information

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665. 

(END)

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Asia Pacific Travel Industry News

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.